ODOT schedules Lane closures at Brent Spence Bridge - Cincinnati News, FOX19-WXIX TV

Lane closures scheduled at Brent Spence Bridge

Posted: Updated:
CINCINNATI, OH (FOX19) -

Survey work will require temporary lane closures on southbound Interstate 75 at the Brent Spence Bridge this week.

Beginning about 2,000 feet north of the bridge, the lane closures will be in place from 10 p.m. Thursday, Jan. 17 to 6 a.m. Friday, Jan. 18 and from 10 p.m. Friday, Jan. 18 to 6 a.m. Saturday, Jan. 19.

Arrow boards and signs are in place prior to the work zone to alert motorists of the upcoming lane closures.

To help ensure the safety of the construction workers as well as the traveling public, motorists should remain alert, reduce their speed and watch for stopped traffic while passing through the work zone.

Copyright 2013 WXIX. All rights reserved.

Powered by WorldNow